Affordable housing
December 2018
Budgeting and Schedule
- Bricks & Soul Ltd purchased Dargai Street on the 18th September 2018
- Programme and schedule of works were created and met.
- Community engagement activated.
- Hyper local strategy implemented to use local tradesmen and to source local materials.
- Property completed 18th December 2018
- Delivered on time and on budget
- Offer accepted from a first time buyer on the 21st of December 2018
Further details
- The house was riddled with damp. Full survey and a New damp proof course installed throughout the house with a warranty
- Removal of old and ugly render
- Sandblasting original bricks
- Re pointing of bricks
- Full re wire
- Fire alarms heat sensors installed
- Re plumb
- New A star rated boiler installed
- New heating system
- New bathroom – with thermostatic shower
- Created a third bedroom by moving the bathroom.
- New kitchen new appliances
- Roof over hall- new flashing repoint the chimney
- New loft insulation
- Re plastered
- New carpets and flooring
- Redecorated throughout
![](https://www.bricksandsoul.co.uk/wp-content/uploads/2019/03/LSP_BricksSoul_1__E4A4946-1620x1080.jpg)
![](https://www.bricksandsoul.co.uk/wp-content/uploads/2019/03/LSP_BricksSoul_1__E4A5076-1.jpg)
![](https://www.bricksandsoul.co.uk/wp-content/uploads/2019/03/LSP_BricksSoul_1__E4A4919-720x1080.jpg)
![](https://www.bricksandsoul.co.uk/wp-content/uploads/2019/03/LSP_BricksSoul_1__E4A5165.jpg)
![](https://www.bricksandsoul.co.uk/wp-content/uploads/2019/03/LSP_BricksSoul_1__E4A4888-1620x1080.jpg)
![](https://www.bricksandsoul.co.uk/wp-content/uploads/2019/03/LSP_BricksSoul_1__E4A5177.jpg)
![](https://www.bricksandsoul.co.uk/wp-content/uploads/2019/03/LSP_BricksSoul_1__E4A5160-1620x1080.jpg)